Anti-termite treatment methods proven to keep termites at bay.

Termites cause extensive damage to homes and other buildings.

These pests can burrow through walls, floors, and foundations in search of a food source and shelter.

This damage can cause serious structural issues for any building that has been infested by termites. That’s why termite prevention is key because it prevents termite damage from occurring in the first place.

Therefore, termite control should be an important part of any construction or renovation project. This can be achieved by integrating anti termite treatment for new construction sites.

What is Anti-termite Treatment in Construction

The purpose of an anti-termite treatment in construction is to provide a chemical barrier against termites before and after the construction of a building.

By implementing anti termite construction practices during pre-construction and post-construction stages, you can significantly reduce the risk of termite damage.

Pre-construction Termite Treatment

Certified specialists apply pre-construction termite treatment before or during foundation work, typically after they level and compact the soil but before they pour the slab. This stage offers the most cost-effective opportunity for treatment because it can fully access the soil.

How It Works

The treatment involves applying a government-approved termiticide (typically Chlorpyrifos or Bifenthrin) to all soil surfaces that will be in contact with the building structure, including:

  • Pile caps — where structural columns meet the ground
  • Ground beams — horizontal foundation members running between pile caps
  • Floor slab areas — the full footprint of the building before concrete is poured
  • Backfill soil — soil returned against foundations and retaining structures

A certified pest control technician applies the termiticide at the regulated concentration to create a continuous chemical barrier. Once the concrete is poured over the treated soil, the barrier is sealed in place.

Duration and Warranty

Pre-construction termite treatment lasts up to 5 years, depending on the termiticide used, soil porosity, and groundwater exposure.

When to Schedule

Anti treatment must be applied before foundation concrete is poured. Once the slab is laid, pre-construction treatment is no longer possible; therefore, post-construction treatment will be required instead.

PROVEN • SAFE • GREEN • TRUSTED

Anti-Termite Slab Injection Treatment

Termite control method that involves drilling holes into concrete slabs and injecting a termiticide to create a barrier against subterranean termites.

Post-construction Termite Treatment

Pest control professionals carry out post-construction termite treatment on completed buildings when pre-construction treatment was not done or when they detect an existing termite infestation.

Unlike pre-construction treatment, they cannot access the soil directly, so they use different pest control methods to create a protective barrier.

Post-Construction Treatment Methods

1. Soil Injection (Drilling Method)

Experts drill holes at regular intervals through floor slabs, walls, and any concrete surfaces in contact with soil.

They inject termiticide under pressure to saturate the soil beneath the slab and create a sub-surface chemical barrier, then seal the holes after treatment.

2. Termite Baiting System

Pest control echnicians install bait stations in the soil around the building’s perimeter. Worker termites feed on the bait and carry it back to the colony, eliminating the queen and the colony within 4–8 weeks.

This method effectively controls active infestations and does not require drilling into floors.

3. Wood Treatment

Exposed timber, door frames, and roof trusses are treated with a borate-based wood preservative to prevent termite feeding on wood surfaces already in the structure.

When It’s Required

Post-construction treatment is recommended when:

  • Your home is over 5 years old and has never had termite protection
  • You spot mud tubes along walls or skirting boards
  • Timber sounds hollow when tapped
  • You are buying a second-hand property

Pest control professionals carry out all anti termite works in compliance with Malaysia’s Pesticides Act 1974.

anti termite soil treatment during construction Malaysia

Not Sure Whether You Need Pre or Post-Construction Treatment?

Talk to our expert advisors for termite site assessment.

Frequently Asked Questions About Construction Termite Treatment in Malaysia

Is termite treatment required during construction in Malaysia?

While termite treatment is not universally mandated by Malaysian law for all building types, it is a requirement under JKR (Jabatan Kerja Raya) specifications for government buildings and is strongly recommended by UBBL (Uniform Building By-Laws) for all residential construction. Many banks and developers also require evidence of termite treatment before issuing a Certificate of Completion and Compliance (CCC). Most importantly, omitting termite treatment exposes your property to structural damage that is not covered by most home insurance policies.

What is the difference between pre and post-construction termite treatment?

Pre-construction termite treatment creates a chemical soil barrier before the foundation slab is poured — termiticide is applied directly to the soil at pile caps, ground beams, and the full slab footprint. It is the most effective and cost-efficient method. Post-construction treatment is applied to completed buildings using soil injection (drilling through floor slabs) or a termite baiting system around the perimeter. Post-construction treatment is necessary when pre-construction treatment was not carried out, or when an active infestation is detected in an existing building.

When should pre-construction termite treatment be applied?

Pre-construction termite treatment must be applied after the soil has been levelled and compacted, but before the foundation concrete is poured. Once the slab is laid, pre-construction treatment is no longer possible. For new builds, the ideal window is immediately after earthworks are completed and before any concrete work begins. Contact Pestmaster as early as possible during your project so we can schedule treatment at the correct construction stage.

How much does construction termite treatment cost in Malaysia?

The cost of construction termite treatment in Malaysia varies depending on the size of the building footprint, the number of storeys, and the treatment method required. Pestmaster provides a site assessment and transparent quotation before any work begins — there is no obligation. Contact us at +6017-322 9928 or fill in the form below to request a customised quote for your project in Selangor or Klang Valley.

How long does pre-construction termite treatment last?

Pre-construction termite treatment using government-approved termiticides typically lasts 5 years, depending on the chemical used, soil porosity, and groundwater exposure in your area. Pestmaster backs all pre-construction treatments with a written warranty of up to 5 years. If termites are detected during the warranty period, we return for retreatment at no additional cost.

Can termite treatment be applied after the slab is poured?

Yes, but the method changes. Once the concrete slab is poured, pre-construction soil treatment is no longer possible. Post-construction treatment must be used instead — typically soil injection (drilling holes through the slab at regular intervals and injecting termiticide under pressure) or installation of a perimeter baiting system. Post-construction treatment is effective but generally more expensive and labour-intensive than treating at the pre-construction stage.

How do I know if my completed home needs termite treatment?

Signs that a completed home may need post-construction termite treatment include: mud tubes running along walls, floor skirting boards, or pipes; hollow-sounding timber when tapped; discarded termite wings near windows or light sources; or visible damage to timber door frames and window sills. If your home is over 5 years old with no prior termite treatment, or if you are purchasing a second-hand property, a professional termite inspection is strongly recommended before infestations become severe.

Does Pestmaster provide a warranty for construction termite treatment?

Yes. Pestmaster’s pre-construction termite treatment includes a written structural warranty of up to 5 years. During the warranty period, if subterranean termites are detected, we return for retreatment at no cost to you. Our Termite Prevention + package for residential renovation includes 3 years of active warranty plus 2 years extended warranty, 2 free inspection visits, and free termite baiting if subterranean termites are detected. Contact us for full warranty terms and conditions.

Hire an Expert for Anti Termite Treatment Works

Anti-termite treatment in construction involves a regulated and technical process, and not all pest control services have the capability to carry it out correctly.

If teams do not perform proper termite control in construction poorly, it can lead to significant costs.

Therefore, in order to solve the problem and prevent future infestations, you can hire a pest control expert such as Pestmaster (M) Sdn Bhd.

Why Choose Pestmaster for Construction Termite Treatment

  • Licensed & Certified
    PestMaster is a PCO-licensed operator (PCO/SEL/615/321), HACCP certified, and registered with Jabatan Pertanian Malaysia. All termiticides used are EPA and Malaysian government-approved.
  • Up to 5 Years Structural Warranty
    We provide a written structural warranty for all pre-construction treatments. If we detect termites during the warranty period, we return at no additional cost.
  • Trained Staff
    Our pest control technicians receive specific training to identify signs of termite infestation and to provide anti termite treatment for new construction and post-construction sites.
  • Service Coverage
    We serve construction projects and completed homes across Selangor, Kuala Lumpur, Subang Jaya, Petaling Jaya, Shah Alam, Puchong, and the wider Klang Valley.

Contact PestMaster today for our full termite treatment services. We respond within the same business day.

Read next: How Hot Weather Causes Pest Infestations in Your Property

Special Xtra Warranty Offer!

Termite Prevention +

Termites could be under your house!

How?

During renovation, the vibrations can attract active termite activity and infestation. Once renovations are complete, termites will show up and damage your house! Prevent termite infestation with Termite Prevention + before renovating your house.

Recommended for Residential Renovation

  • 3 + 2 Years Warranty

  • Free 2 Inspections

  • Free Termite Baiting* (NP: RM1800)

  • Slab Injection

  • Pestmaster Wipeout Plan

*Termite baiting applies if subterranean termites are detected during warranty.

Contact for Special Price !

Filling up the form below

Our friendly team will contact you shortly.

Fair price + good service + service guarantee


    DISCLAIMER

    Pestmaster is a licensed pest control company certified by HACCP, MPSJ, and Jabatan Pertanian Malaysia. All treatments are carried out by trained, certified technicians in compliance with Malaysia's Pesticides Act 1974

    Click +6017-322 9928